A commercial cleaning specification is a written schedule listing every area of your site, the tasks carried out in each, how often each task happens and when cleaners can access the building. Written with defined frequency terms and minutes allocated per area, it lets every contractor price the same work and gives you a clear standard to inspect against.
What a cleaning specification is for
A specification does three jobs. It tells a contractor exactly what to price, it tells the operatives on site what to do each visit, and it gives you something concrete to check the work against.
Without one, each contractor prices from a walk-round and their own assumptions. The cheapest quote is often cheapest because it assumes less work, and you only find out after the contract starts. A written specification removes that guesswork and should be attached to the contract so it is the standard the contractor is held to.
Break the site into areas
Start with an area schedule: a list of every space that needs cleaning, grouped by type. For each area, record the floor type, the approximate size, how busy it is and any restrictions, such as secure rooms or areas that can only be cleaned when empty.
- Entrances and reception
- Open-plan offices and private offices
- Meeting rooms and training rooms
- Kitchens, tea points and staff canteens
- Washrooms, showers and changing rooms
- Corridors, stairs and lifts
- Warehouse, production or workshop floors
- External areas such as bin stores, smoking shelters and entrance paving
Define your frequency terms
Most disagreements about cleaning come from frequency words that mean different things to different people. Define each term once at the top of the specification and use it consistently.
Daily should mean every scheduled cleaning day, and you should state which days those are, for example Monday to Friday. Weekly means once a week, ideally on a named day so it can be checked. Monthly means once in each calendar month. Periodic covers work done a few times a year, such as quarterly high-level dusting, six-monthly carpet extraction or an annual machine scrub and reseal of hard floors.
Avoid 'as required' unless you also say what triggers it and who decides. Left undefined, it tends to mean 'rarely'.
Describe each task at the level you will inspect
'Clean washrooms' is not a task you can check. 'Clean and disinfect toilets, urinals, sinks and taps; clean mirrors; empty sanitary and waste bins; replenish soap, toilet roll and hand towels; mop the floor' is. Write each task so that someone walking the area afterwards can say whether it was done.
Where it helps, add the expected outcome as well as the action, for example 'desks free from dust and marks' or 'floor free from visible dirt and spillages'. If the site has specific hygiene needs, such as colour-coded equipment for washrooms and kitchens, say so in the specification rather than leaving it to the contractor's discretion.
Access hours, consumables and site rules
State when cleaners can be on site: early morning, evening, overnight or during the working day. Access hours affect price, staffing, lone working arrangements and security, so every contractor needs the same answer. Include how keys, fobs and alarm codes will be managed.
Be explicit about consumables. Say who supplies toilet roll, hand towels, soap and bin liners, and whether specific dispensers or products must be used. Cleaning chemicals are normally the contractor's responsibility, including their COSHH assessments under the COSHH Regulations 2002. Finish with any site rules: inductions, signing in, PPE and areas that are off limits.
Use minutes per area to make quotes comparable
The most useful thing you can ask for is the time allocated to each area per visit, and the total labour hours per week. Once every contractor shows their minutes, you can see why prices differ. If one quote is built on far fewer hours than another for the same specification, one of them has misjudged the work.
Minutes per area also make the contract easier to manage later. If you add a floor, change occupancy or drop a frequency, the change can be priced from the same basis. Städar prices every contract from a site survey with a written specification listing each area, its frequency and the minutes allocated, for exactly this reason.
Common questions
Should I write the cleaning specification myself or let the contractor write it?
Either works, as long as the final version is agreed in writing and every bidder prices the same document. Many buyers ask a contractor to survey and draft it, then review it themselves before sending it to others.
What is the difference between an input and an output specification?
An input specification lists tasks and frequencies. An output specification describes the standard to be achieved, such as floors free from visible dirt. Most workable specifications combine the two.
How often should a cleaning specification be reviewed?
Review it at least once a year and whenever the building changes, for example new occupancy levels, a refit or different working hours. An out-of-date specification means you are paying for the wrong work.
Should periodic cleaning be included in the main price?
It can be spread across the monthly price or quoted separately. Either way, list each periodic task and its frequency in the specification so it is priced and scheduled rather than forgotten.